The single three-times wide staircase up to the upper mezzanine level where it continues to the Pacific Street Station and 4th Avenue Line's platforms.
The turnstiles that are directly on platform B for LIRR tracks 3 and 4 that lead down to the subway's underpass. There are no token booths in site for these turnstiles.
On the corridor to the staircase down to the Brighton Line's platform, there taped off because no trains are running due to the blizzard of Christmas 2010
Passenger duck underneath the tape designed to close off access to the closed Brighton Line platforms since no trains are running, unfortunately the exits weren't fully locked and people used them
An attempted to be closed High Turnstile leading to the Closed Brighton Portion of the Atlantic Avenue Station
A track illuminator sign for the LIRR along the mezzanine passageway for a Peak train to West Hempstead on track 5
A sign near the B, Q platforms tells passengers to walk to the opposite end of the station to catch the 6th Avenue service on Late Nigthts and Weekends
Illuminated signs for rush hour LIRR departures to Huntington and West Hempstead
Approaching the central busy area beneath the IRT platforms
Payphones and a new information kiosk beneath the LIRR platforms
The wide staircase to the main exit and Manhattan-bound 2,3 platform
A MVM and 3 high entrance turnstiles greet passengers from LIRR platforms 1 and 2
The staircase to the B,Q platform is beyond these High Entrance turnstiles
Lightboxes display photographs along this mezzanine
Another view of this lightbox display: Grown in Brooklyn by Valery Rizzo, it is food grown in Community Farms in Brooklyn
Ending up on the wrong closed side (the B and Q are not running after Superstorm Sandy) of the tape from the Q platforms, the entrance from the Barclays Center was totally opened
Looking back towards two rows of tape at the Brighton Platform end of the mezzanine, closed (along with the LIRR entrance from tracks 1 and 2) after Superstorm Sandy
The Where to Go Kiosk? and some carpentry going on because of construction in the mezzanine